The drywaller's crew has started mudding the 2nd pass of the house. Then there will be the pervasive dust when sanding, and then a 3rd pass with the mud.
The crew has built a workshop downstairs for doing the trim. Charles picked up 15 sheets of 3/4" MDF - that will keep the crew busy for a day or two.
The tub base for the ensuite has been built, and is ready for the tub. Virtually all teh trim has been primed, and most has been sanded with steel wool (#0000).
No comments:
Post a Comment