Drive up - Nov 11th.
Garage is first to be shingled in order to provide some protection for the garage floor, which is being prepped for pouring the concrete next week.
This is the garage floor being prepared.
Crushed rock was placed and leveled. The insultarp and wire mesh was placed, and now the heat tubing is being installed. Once the floor is poured, the garage doors can be installed.
This is the view of the garage from the driveway. The wood blocking, in front of each door, forms the lip at the garage doors.
We talked briefly to the roofers as they were leaving. They said the roof will go quite quickly. They plan on working on the weekend if the weather is nice to get it completed as quickly as possible. We are glad about that of course.