Tuesday, November 08, 2005

Day 215 - lots of stuff!

Drive-up view

The returns are now built on the garage gables.

Exterior view for the piping for the boiler and the air exchanger.

Garage - the large rocks in front of the garage were removed from the backfill in the garage. This is in preparation for doing the garage floor.

The septic tank, now partially buried.


This is the trench where the pipe will run from the septic holding tank to the septic field.

The septic field.

No comments: