Nov 2nd/05.
The septic tank was just dropped off. It is upside down in this photo. The tank will be installed in the hole behind the kitchen, and then the effluent will be pumped up to the septic field.
This is the base for the hydro meter. We are waiting for hydro inpsection.
I wonder if we will get a Smart Meter?? Will have to see.
This is the electrical panel - looks like 200A but not a generator ready version...
No comments:
Post a Comment