Post recovered by Gerry! Many thanks, Gerry!!
Monday May 30th.
The bottom few rows of the ICF are now installed. The corners are now all squared, the walls are leveled and straight, and bottom row and footings are foamed at the join.
You can see that the doorways into the cold-storage are cut out now. The first few rows were placed before cutting out the openings, otherwise it would not have been possible to get the length of the wall correct.
The new construction banner.
No comments:
Post a Comment