Friday, August 05, 2005

Day 120 - basement floor ready for concrete

The Wirsbo radiant heat tubing installation in completed, tied off to the wire mesh, and is now ready for the concrete.

The second picture shows about a 1' gap (in the center of the photo) between the tubing runs. This is where a future wall is planned.

No comments: