Saturday, September 22, 2007

laying sod


Friday ~2pm: The sod arrived on Friday afternoon - 180 rolls (2'x5'), about 2 1/2 pallets worth.

Friday ~4pm: Here we have spread out peat moss - this represents about 25 bales of peat moss (3.8 cu ft each). This is to help the sod hold onto the water as the soil is very poor.

Saturday ~7am: We laid out one of the pallets of sod on Friday before and after supper, and then set the sprinkler up.


Saturday ~11am: Here the sod is all down. And how pretty it looks too.

No comments: