I installed a light and some plugs/switches on Sunday. There's a big push to get everything completed so we can move in on Saturday, March 11th. We found out that the little house we're living in was rented to another person for March. We thought we would be in our house already by the end of February.
Complete tile Monday/Tuesday. (should have been done weeks ago)
Electrician coming Tuesday.
Countertops coming Tuesday.
Heinz (cabinets) coming to finish up on Tuesday - install missing crown moulding on bath cabinets.
Heating coming Wednesday - hookup floors and HRV.
Plumber coming Thursday or Friday.
Had to postpone glass guy (was scheduled for Monday) as tile in shower is incomplete.
Scheduling network completion and security system.
Some photos.
A very patient Tawny, waiting for a treat in the master bath.
Another example of the fine trim work. The maple french door is not yet finished.
Dave fixing the ceiling in BR2.
The drywall boarders made a real mess of some of the electrical wires - cutting off the insulation. These wires will need to maretted together with a pigtail. They cut right through a wire on a switch,
I covered the light I installed in the office with a plastic bag to keep the dust off it. Freda says, "Just like Candace Olsen!"
The kitchen looks pretty stunning! The paper is to protect the floor from all the foot traffic.