The drywall is complete, but there is something funny here...
What drywall ceiling would be complete without antigravity dogs? See their muddy footprints on the ceiling.
I installed the pot lights on the one side of the lower level - one light is not installed because I had to patch the drywall right where the hole is - the wires are hanging down at the left. You can see the entire ceiling has been taped and mudded. All that's missing here is the corner bead at the wall/ceiling joint.
No comments:
Post a Comment