While I was waiting for the building inspector, I installed sound insulation in the walls around the bathroom. The inspector came and okayed everything, so we can install the drywall.
Our doors and trim were delivered today.
Here is Louis fastening the drywall to the ceiling in the ensuite bathroom.
The kitchen now has drywall too - Yippee!!
No comments:
Post a Comment