
You can also see in this photo that the stucco has been completed, including a little box behind the hydro meter base. The sill on top of the stone was wider than the stand-off legs on the meter base, so an extra piece of wood had to be installed to hold the meter base solidly, and then the little box was built on top of it.
No comments:
Post a Comment