
This is a house blog once again. It is also an occasional dog blog, flower blog, and bird or other creatures blog...
The maple french doors now have had their second coat of urethane, so the protective plastic has been removed.
The stucco guys have been preparing the walls for the base coat.
Stucco requires a foam backer. The stucco guys are installing foam on the gable ends. Then the mesh will be put on and a base cement coat will be trowelled over it.
Tawny, surveying the lake on a calm morning, looking for geese or ducks to chase.
Tawny returning for a goose chase.
Tawny, returning from a pre-dawn goose chase. (5:26am, April 17th)
Fish in the lake
Ice is almost all gone from the lake.
Tawny doesn't realize that logs hold little nutrition for dogs!
Drive-up Wed April 12th - the piles of dirt and rock are starting to disappear.
Stone work almost complete.
Stone above the office window.
Garage. The van is for the glass people who came and installed in the evening for us! A nice surprise - someone willing to accomodate us instead of vice versa.
The hole corers, coring holes for the dryer vents, cold storage vents, and a central vac line in the garage.
Chris putting on some last pieces of trim.
Dave installing the powder room doorknob.
Newel posts arrived and are being varathaned.
Freda with her new closet.
Dryer installed, after conversion to propane and changing the exhaust to go out through the bottom.
Network installed, so we now have phone service.