Sunday, April 30, 2006

Pre-dawn goose chase

Tawny, surveying the lake on a calm morning, looking for geese or ducks to chase.

They really don't have much to fear from her.




Tawny returning for a goose chase.

The geese don't pay much attention to Tawny (much to her chagrin I am sure) when they are paddling away in the middle of the lake.

If she's lucky, she might get a sideways glance.


Tawny, returning from a pre-dawn goose chase. (5:26am, April 17th)

Thursday, April 27, 2006

Stucco and Mother Nature

Mother Nature is unpredictable. Last week we had beautiful sunny days with temps above 20C. This week, the temps have been in single digits, and we have had some frost in the mornings. It started raining last Saturday, and rained until Tuesday evening, and another shower yesterday afternoon.

The stucco company was planning on starting this week. Some scaffolding was dropped off last week in preparation. In order to guarantee the work, the stucco guys will not work unless the daytime low is greater than 6C. Well, the weather this week has been cold and rainy - not good for stucco.

It's too bad they couldn't have taken advantage of the nice weather last week to get the scaffolding set up. Although it's -1C as I write this, today is supposed to be a nice suuny day with a high of 9C, so hope things will get kicked off with the scaffolding today.

Monday, April 24, 2006


The view from one end of the lake. Our house is at the middle spot on the right side of the image.

A beautiful sunset (from last week)

Thursday, April 13, 2006

More updates

We moved most of our furniture upstairs on Sat Apr 8th. Since our house has fewer rooms, we don't have space for all of the furniture, some remains in the basement.

Now for the photos.

Fish in the lake

Ice is almost all gone from the lake.

Tawny doesn't realize that logs hold little nutrition for dogs!


Drive-up Wed April 12th - the piles of dirt and rock are starting to disappear.

Stone work almost complete.

Stone above the office window.

Garage. The van is for the glass people who came and installed in the evening for us! A nice surprise - someone willing to accomodate us instead of vice versa.

Friday, March 31, 2006

Updates

The hole corers, coring holes for the dryer vents, cold storage vents, and a central vac line in the garage.
Chris putting on some last pieces of trim.
Dave installing the powder room doorknob.
Newel posts arrived and are being varathaned.
Freda with her new closet.
Dryer installed, after conversion to propane and changing the exhaust to go out through the bottom.
Network installed, so we now have phone service.

Tuesday, March 28, 2006

water quality

We got our water quality test back on Monday. 0 Bacteria. 0 E.Coli. low iron. no sulphur. no nitrogen. 7.5 pH. 15 grains of hardness.

So water quality is good - taste, clarity, colour - but is hard, so we need to get a softener.

Stone is getting delivered on Wed. Stone mason will start this week or next.

Tuesday, March 21, 2006

A busy week!

A lot of photos from the past week. Most recent first, in the spirit of the blog.

As you can see, we have bullnose corners on the drywall, and I wanted the trim angled in the same way. It was a bit picky for the carpenters, but they did a very very excellent job on it. The trim is all painted with CC306 Cable Knit (a Ben Moore colour), although it looks almost white in this photo.
This is an example of the fine trim work. We have a 6 1/2" Hopper baseboard, and used the doorstop moulding as the shoe (covers the floor/wall joint) as it has a similiarity with the base. We have a 7 1/2" base blcok, and a 3 1/2" Murphy Brown door casing. We do have a wider 4 1/2" casing around the large window in the great room.
THis is the kitchen after the microwave was installed. Fortunately Chris was able to extinguish the fire very quickly!
On Saturday, Charles and Chris installed the washer and the microwave. The dryer wasn't installed because an electric one was delivered instead of the gas dryer we had ordered. Charles is checking out the washer to see if it is stable during the spin cycle.
Saturday was very tiring. This is a happy but exhausted Freda having a little snack.
On Saturday March 18th we moved from the little house. That's the building on the left, behind the two green cars.
Dave, standing by his handiwork. The drawers are not installed yet in the center section. There will be 4 drawers here.
Dan the painter, caulked all the base shoe and painted all the base. It looks great!!!
Nick the electrician finishing up the electrical installation. Look at the underside of the column bases - another example of some spectacular finish carpentry!
Chris installing the shelves in the closets.
Appliances arriving. When they tried to bring the fridge in, we discovered that the 36" door from the garage to the house was not 36"! How dumb is that! The sink and faucet is installed in the powder room. (It's Kohler and it's gorgeous!) After the lights were installed, it was obvious what a terrible job the drywallers had done in here - obviously too lazy to get a light in the room to see if they did a good job or not. So more drywall repairs, sanding, and of course repainting.
Dave is installing the closets in the master.
The fan in the great room was so heavy, it kept pulling out the screws that were holding it up. The crew ended up put a big beefy 2x8 in the attic, and putting 6" lag bolts into it.
The electricians thought they had put a plug here, but I guess not. More drywall repair and repainting. Sigh.
This is the plumber and his apprentice doing the vent test (we failed the first one).
This was the source of the problem and the reason why we failed the vent test last week. When the plumbers moved the vent before, the very very rough cut (between the two elbows) let air (and sewer gases!) out.

Monday, March 20, 2006

moved!

Well, we moved in on Saturday. Finally! Well, sort of moved in. More later.

Thursday, March 16, 2006

Move date - Sat March 18th (finally!)

We are moving in on Saturday, March 18th. Not everything will be complete, but we are moving in anyway. We have no choice. We must vacate the little house we are staying in as it was rented for March to somebody else, and we have been begging forgiveness for the delay.

The electricians discovered they have a cut wire somewhere in the attic, so they need to trace that and replace it.

Received maple spindles and railing, but not newel posts. All but 6 of the spindles are pretty poor quality, with chip-outs, etc. So they have gone back to the supplier.

Flooring is behind schedule. Sadly, we are no longer floored by this (hahah).

Discovered some really sloppy drywall work - it was behind the door in the powder room, so didn't see it until I could close the door and turn on the light... The painters hadn't painted the 2nd colour coat in there anyway.

Countless dings and bangs in the walls. Worst offender are the flooring guys. Most of the mess is just sheer sloppiness, flinging grout and tile mortar wherever.

Appliances delivered today. Electric dryer delivered instead of the gas version we ordered.

Quotes for exterior finishing are coming in. Expect to decide on that this week, and order exterior stone so we can avoid the 5% price increase coming in April.

Appliance hook-up happening tomorrow.