This image is from Google Earth, a satellite view of 54 Speers. Neat that you can see our cedar deck.Check it out at http://earth.google.com.
According to Google Earth, the lat/long of our new house is: 45 deg 16' 41.88" N 76 deg 04' 24.41" W.
This is a house blog once again. It is also an occasional dog blog, flower blog, and bird or other creatures blog...
This image is from Google Earth, a satellite view of 54 Speers. Neat that you can see our cedar deck.
Click for larger picture.
This week the crew spent several days stripping the scaffolding support for the main floor, and stacking up all the roll bars.
This is what the basement looks like without all the support structure and plywood for holding up the main floor. Some of the reflective bubble wrap is falling down a bit, but that will be fixed later.
This is what the Insul-tarp looks like.
This is the plywood that was previously under the concrete on the main level. It has been removed and is now stacked until it can be reused for the roof sheathing.
This is Freda standing in the future kitchen eat-in area. I only really have basement floors to compare this to, but I have to say the floor is impeccably finished. Charles says there are some "highs and lows", but I have to say that it sure looks to me like the floor finishing crew really did an awesome job! (This will make it easier when the finish flooring guy comes to do his bit.) On top of it all, it was quite hot and humid yesterday, so it must have been quite unpleasant. On the other hand, it rained yesterday (quite heavily at the start -- the wind and rain were ripping leaves off trees!) which would help keep the concrete damp so it doesn't cure too quickly (and then crack!).
This photo shows the window bucks that the crew put together in preparation for the walls on the main level. There's a lot of wood in them thar bucks (all 2x12 except at the base), which means they are heavy... This photo also shows the concrete floor deck and the Canam-Hambro joists that are holding it all up.